Renovation work for face-to-face - メーカー・企業と製品の一覧 | イプロス

Renovation work for face-to-faceの製品一覧

1~1 件を表示 / 全 1 件

表示件数

New concept! What is the renovation work that addresses surfaces with asbestos-containing finishing materials?

The 'Net Barrier Method' allows for simultaneous renovation work on buildings and measures against asbestos-containing finishing materials! It is suitable for buildings such as schools and public facilities that require asbestos measures in a short period.

Many buildings still use paint materials containing asbestos, and while there is pressure to remove or demolish them, there are no established methods, making removal time-consuming and labor-intensive. Additionally, there are issues such as a shortage of experienced asbestos removal workers and a lack of high-pressure washing machines. As a result, even if one wants to "renew the building," it is difficult to start renovation work until the asbestos removal is completed. The renovation construction method "Net Barrier Method (Composite Exterior Wall Renovation Method)," developed in collaboration with major companies, aims to prevent the peeling of deteriorated "mortar-finished exterior walls" and "tiled exterior walls," and it can be adapted for work on surfaces with asbestos-containing finishing materials! (Proven results☆) 【Features】 ■ Some areas may be treated as small-scale work! Just remove the coating by creating a Φ10.5mm recess before pinning! ■ Confirmation tests conducted by public institutions! No asbestos detected ■ Prevents lifting and peeling of finishing materials! Enhances design with new finishes ■ Minimal training required for managers and workers *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Plastering and painting work
  • Renovation work for face-to-face

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録